Prep:
- Clean: this is a big one for the master bedroom, since I live with a pile-er rather than a put-it-away-er. Gah. Done!
- Patch: this took me a lot longer than anticipated. There are two patches in my room that took a long time - they are about 5"x5" and were just covered and taped when we moved in. Luckily, it was joint tape, so it was ready for plaster. This definitely needed a few coats, with sanding in between. Then there was the easy patching: nicks and dings and nail holes. Done!
- Caulk: now this was easier than expected, thank heavens. Not too many gaps between the wall and the baseboards or trim. Done!
- Supplies: paint has been purchased. Done!
Headboard: Oh yes, I'm making a headboard, too...
- Backer: bought some plywood at Lowes. Did you know they will cut it for you for free? Okay, only two cuts for free, but since I only wanted one cut, it was perfect.
- Batting: had a ton of this hanging around, so no spending there (and I'm using up something - yay!).
- Fabric: dragged all the kids to Joann's (bad idea) and barely made it out in one piece. The fabric was still good, though.
- And then I stapled it all together. It's now ready to mount on the wall. I can't wait to show it to you!
Can't wait to see it!!
ReplyDelete